| Construction Photo Album
February - April 2008 HOME |
| Page 2 of 2 |
| |
|
| 4/25/2008 | 4/25/2008 |
Below: forming the arch for the arch windows over the entrance doors into the narthex (lobby).
Below: The wall and doorway between the narthex and nave, seen from the interior.
Below: Looking toward the altar platform area. Along this back wall, will be the sacristy, storage rooms and mechanical room.
BELOW: Another view of the area where the altar will be located. The mechanical room will be on the left and sacristy and storage in the middle and right with a wall in front of that to form the altar area.
BELOW: Look toward Bell Rd side of church. The alcove in the back is where the choir storage and choir will be. On right is where altar will be located.